California Wastewater Treatment Operator Practice Exam

Disable ads (and more) with a membership for a one time $2.99 payment

Study for the California Wastewater Treatment Operator Exam. Use flashcards and multiple-choice questions with detailed explanations to boost your readiness. Prepare with confidence and aim for success!

Each practice test/flash card set has 50 randomly selected questions from a bank of over 500. You'll get a new set of questions each time!

Practice this question and more.


What should be scheduled every 3 months for a flamer arrester in an anaerobic digester?

  1. maintenance

  2. cleaning

  3. replacement

  4. upgrade

The correct answer is: maintenance

The flamer arrester in an anaerobic digester is an important safety device that removes any flames or sparks from the digester's exhaust. To ensure its proper function and minimize any potential risks, maintenance should be scheduled every 3 months. This involves inspecting and servicing the device to ensure it is still functioning effectively and replacing any worn out or malfunctioning parts. The other options, such as cleaning, replacement, or upgrade, may be necessary at some point for the flamer arrester, but they do not need to be done every 3 months. Therefore, A is the most appropriate answer.